--- ESnet Service Availability Report for DOE-ALBQ, Jul 2016.

ESnet uptime Jul 2016:      99.608% (Site outages filtered)
ESnet downtime Jul 2016:    002:55:06(h:m:s)

Total uptime Jul 2016:      99.608% (Site outages included)
Site downtime Jul 2016:     000:00:00(h:m:s)

--- Outage Event Summary

Duration         Start Date/Time
001:23:11(h:m:s) Thu Jul  7 08:58:30 2016 (US Pacific)
000:04:29(h:m:s) Thu Jul  7 10:27:44 2016 (US Pacific)
001:27:26(h:m:s) Thu Jul 28 19:05:39 2016 (US Pacific)

--- Outage Event Detail

Title:         ALBQ-CR5 < 54.KGGS.000030..MS > SNLA-RT3 - Circuit Down
Date:          Thu Jul  7 08:58:30 2016 (US Pacific)
Duration:      001:23:11(h:m:s)
Type:          Unplanned
Organization:  Carrier/CenturyLink
ESnet Ticket:  ESNET-20160707-007
Description:
The 10G circuit between ALBQ and SNLA is back up. SNLA reported that CenturyLink has incorrectly turned down the wrong circuit during maintenance.

Title:         ALBQ-CR5 < 54.KGGS.000030..MS > SNLA-RT3 - Circuit Down
Date:          Thu Jul  7 10:27:44 2016 (US Pacific)
Duration:      000:04:29(h:m:s)
Type:          Unplanned
Organization:  Carrier/CenturyLink
ESnet Ticket:  ESNET-20160707-007
Description:
The 10G circuit between ALBQ and SNLA is back up. SNLA reported that CenturyLink has incorrectly turned down the wrong circuit during maintenance.

Title:         SNLA power work
Date:          Thu Jul 28 19:05:39 2016 (US Pacific)
Duration:      001:27:26(h:m:s)
Type:          Planned
Organization:  ESnet/SNLA
ESnet Ticket:  ESNET-20160711-003
Description:
SNLA will be performing power and cabling work that requires the move of ESnet's SNLA-RT3 router to a different cabinet in the same room. 

During the maintenance window the router will be fully powered down for the move resulting in a service-affecting outage. 

After the move is complete and power and connectivity are restored, ESnet and SNLA engineers will verify all internet services are back up.